Skip to content

Posts from the ‘Básar’ Category

Our pictures from last summer

Selfies, trail building, hiking… and lots of food. These pictures tell the story of our adventures last summer.

https://trailteam.is/2020-volunteer-gallery/

Although travel plans were disrupted at the start of the summer, many of our volunteers were able to join us in July and together the teams managed to completed more than 100 weeks of practical work. In addition to maintenance work on the hiking trails in Thórsmörk and Goðaland, the volunteers also worked closely with our Forest Service colleagues on a series of tree planning projects on other sites as part of our carbon sequestration initiative.

We have now started putting together a team for 2021 and full detail including application forms are now available here on our homepage. Applications for next season will be open until January 31st.

https://trailteam.is/opportunities/

Our week on the trails

The team have gathered some of their pictures of this season’s first big week on the trails. It has been an amazing week of trail work, bridge building, hiking and camp fires… with lots more adventures still to come.

 

 

 

 

 

Forest Service – Trail building with timber

Timber built trails have become one of the main features of our maintenance work in Thórsmörk and Goðaland.

Although we do work with stone when it can be found close to the trails, there are many areas on the trail network where there is little natural building material available. Since our volunteer programme began in 2012, we have been developing trail maintenance techniques using timber produced from the forests of south Iceland and these timber trails are now a common site throughout the Thórsmörk area. During this time, several types of timber have been trialled, but the majority of this work has been done using Icelandic-grown Sitka spruce.

Where possible, new steps are built wider than the existing trail to help prevent erosion and the height of the steps is limited to approximately 15cm to make them comfortable to walk on. Low steps are particularly important for visitors carrying heavy backpacks. Flights of steps are usually built with regular spacing. Long timbers are used to make drains (waterbars) and these are added to each section to divert water from the steps and to help protect them (shown in middle picture).

Timber sides can be added to help secure steps over bedrock areas and these help to prevent material from being washed out of the steps (shown in the picture on the right). On freshly repaired sections, rye grass seed is added to stabilise the areas around the trails. This is fast growing but only grows for one to two seasons, helping to stop loose material being washed away. As the rye grass grows and then dies back, it allows time for the slower growing natural vegetation to re-establish itself beside the trails.

This summer, our trail building with timber continues as our team move to new worksites in Thórsmörk and Goðaland.